Written by : Ahmad Izzat Bin Mod
Arifin, Mohamad Yusof Mat Zin
The National Energy Policies and
Development Plan were created in 1979 by the Malaysian Government. In 2001,
government officially announced that Renewable energy (RE) as a fifth fuel in
energy supply mix. Thus followed by National Green Technology Policy in 2009
that Green Technology as the driver to accelerate the national economy and
promote sustainable development.
As the renewable energy industry is
rapidly growing with incentives from the government, so Kumpulan Melaka Berhad
(KMB) has emerge as main player in solar energy project in Malaysia. 5 MWp Solar Farm with the total cost
investment of RM46 Million is located at Alor Gajah, Malacca Malaysia.
A group of EE112 students from
semester 5 who’s taken EPO358 subject had an opportunity to visit KMB 5 MWP
Solar Farm. The main objective of this trip is to give an exposure to the real
situation of solar farm and gain some practical knowledge from the qualified
engineer.
This project was commissioned and
started to export the energy generated to TNB at:
o
Phase
1 (1.30 MWp)
-
Initial
operation date (IOD) :11 April 2013
-
Feed-In-Tariff
commencement date (FITCD) : 20 April 2013
o
Phase
2 (1.22 MWp)
-
Initial
operation date (IOD) :16 Mei 2013
-
Feed-In-Tariff
commencement date (FITCD) : 24 Mei 2013
o
Phase
3 (2.48 MWp)
-
Initial
operation date (IOD) :2 August 2013
-
Feed-In-Tariff
commencement date (FITCD) : 9 August 2013
Total Cost Investment as shown as
below:
Solar PV System :RM38
Million
Infrastructure
:RM 2 Million
Land
Cost
:RM 6 Million
Year of Return Investment : 12 Years